The Job:
Complete kitchen surface makeover: removing outdated finishes and installing durable new quartz countertops with a full-height tile backsplash.
Where Was This Completed:
The job was done in the Legacy Subdivision in Star, ID. September of 2025.
What We Did:
Our team performed a complete kitchen upgrade starting with the careful removal and disposal of the existing countertops and backsplash. We then fabricated and installed custom quartz countertops paired with a seamless, full-height tile backsplash, delivering a durable, low-maintenance finish with modern aesthetic appeal.
The Result:
The homeowners were thrilled with our efficient 2.5-week project turnaround from initial measurement and templating to final installation. By completing the tear-out, countertop delivery, and tile installation all in a single day, we minimized kitchen downtime to under 12 hours.